• Water Well Drilling Rig Maintenance Drilling Machine Workover Rig in Oilfield Drilling Equipment
  • Water Well Drilling Rig Maintenance Drilling Machine Workover Rig in Oilfield Drilling Equipment
  • Water Well Drilling Rig Maintenance Drilling Machine Workover Rig in Oilfield Drilling Equipment
  • Water Well Drilling Rig Maintenance Drilling Machine Workover Rig in Oilfield Drilling Equipment
  • Water Well Drilling Rig Maintenance Drilling Machine Workover Rig in Oilfield Drilling Equipment
  • Water Well Drilling Rig Maintenance Drilling Machine Workover Rig in Oilfield Drilling Equipment

Water Well Drilling Rig Maintenance Drilling Machine Workover Rig in Oilfield Drilling Equipment

After-sales Service: Overseas After-Sale Service
Warranty: 12 Months After Arrive at The Port
Certification: CE, ISO 9001:2008, API
Condition: New
Motor: AC Motor
Drill Hole Diameter: 500mm Above
Samples:
US$ 150000/Set 1 Set(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2021

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
XJ350J
Drill Hole Depth
2000m Above
Bit Type
Diamond Bit
Drilling Way
Rotary
Transport Package
by Bulk
Specification
14000*3500*3100
Trademark
BEYOND
Origin
China
HS Code
8431431000
Production Capacity
1000 / Year

Product Description

Rig Description:
XJ350J workover rig is truck-mounted rig. Max load is 900kN, mast height is 23.5m, It can be divided
two parts: self-propelled chassis, drive mode is 6×6, working device on deck is used for workover service.
Power system: high speed diesel engine, hydraulic and mechanical transfer substructure,
Cummins ISLe 340 40 diesel engine and the performance is perfect, with BY352 hydraulic
transmission box.
Water Well Drilling Rig Maintenance Drilling Machine Workover Rig in Oilfield Drilling Equipment
Mast assembly is double sections, raising,lowering and telescopic by hydraulic cylinders. The
inclined angle of the mast is 5 °s, which can be adjusted by screw rod; The crown block is box style frame,
the pulleys are dynamic equilibrium tested; Besides, rope- block board is set in the pulley seat to avoid
bouncing.
Drawworks assembly: single-drum, max fast line pull is 140kN, belt brake structure.
Hydraulic and pneumatic control system: hydraulic oil pump and control valve of drum
are western models, change valve adopts pneumatic and manual control structure, easy
operation and pipeline.
 
Water Well Drilling Rig Maintenance Drilling Machine Workover Rig in Oilfield Drilling Equipment
Technical specificaiton:
 
1)  Normal small workover depth(m) 4000(2-7/8″ oil tube)
2)  Rated hook load(kN) : 600
3)   Max. hook load(kN):  900
4)  Rated power of engine(hp) :  340
5)  Height of mast (m): 23.5
6)  Traveling system : 4×5
7)   Dia. Of wire line(mm) : φ22

Shipping & Packing: 
Water Well Drilling Rig Maintenance Drilling Machine Workover Rig in Oilfield Drilling Equipment
Water Well Drilling Rig Maintenance Drilling Machine Workover Rig in Oilfield Drilling Equipment
Our Clients:
Water Well Drilling Rig Maintenance Drilling Machine Workover Rig in Oilfield Drilling EquipmentWater Well Drilling Rig Maintenance Drilling Machine Workover Rig in Oilfield Drilling Equipment
FAQ: 
1, Are you a trading company or manufacturer?
We are a professional purchase agent for our long-term clients with 10 years experience, and our products have been exported to more than 20 countries of Azerbaijan, Kazakhstan, Asia, South America, Africa, India, Egypt, and get a good reputation in the world.

2, How about your machine quality?
API, ISO9001 certified, All of our machines must pass a great number of strict testing in order to offer the best quality to our customers.

3, Do you have an after-sale service?
Yes, we provide an overseas after-sale service team that will offer you the best technical maintenance guidance, and now online technical support is a necessity.

5, What about the quality warranty?
We offer a one-year quality warranty mainly for the main mud pump, but for the small wearing parts around 6 months. We provide one-year spares when delivering the mud pump.

6, How long can you deliver the machine?
Generally, parts mainly have at stock, pumps we can delivery in 20 working days.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now