Customization: | Available |
---|---|
After-sales Service: | Online/Engineer |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 13000/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The substructure is one of the important components of the truck-mounted drilling rig and the workover rig, which consists of the boat basement,mast substructure, substructure body, floating platform, Loading/Pipe ramp, BOP installation device, etc.
Boat basement is mainly used to support the main unit of the rig. Mast substructure support mast and the load of the hook block. Substructure body supports the load of rotary table and save standing. The floating platform on the substructure body store wellhead tools and offer working area for driller and wellhead worker. The lower of substructure body can provide space for installation of rig tool. The BOP installation device is used to install BOP. Slide way is used to lift or put down the drill pipe.
The load of the drilling rig can be passed to the substructure and the earth by the previous different parts when the drilling rig is working.
Features
Designed and manufactured in accordance with API Spec 4F standards.
ANSYS finite element analysis technique is used to check the load distribution.
The material of the low temperature substructure is low-alloy, high-strength, low-temperature impact-resistance material, and it is welded according to low temperature welding process, so it can meet the requirements of -45ºC low temperature environment.
Depending on the structure, the substructure is divided into telescoping type, folding type and integral type.
Main standards for the design and manufacture of substructure are as follows:
GB/T 23505: Petroleum Drilling and Workover Rigs
SY/T 5609: The types and basic parameters for oil drilling rigs
API Spec 4F: Specification for Drilling and Well Servicing Structures
SY/T 5170: Petroleum and natural gas industries-specification for wire rope
SY/T 5025: Specification for drilling and well servicing structures
API Spec 8A/8C: Specification for Drilling and Production Hoisting Equipment
Model
|
DZ450/10.5-S
|
DZ450/9-G
|
DZ450/9-KS
|
DZ450/9-K
|
DZ450/7.5-K
|
Drill floor height m
|
10.5
|
9
|
9
|
9
|
7.5
|
Clearance height under rotary beam m
|
9.23
|
7.42
|
7.73
|
7.6
|
6.24
|
Max. load of rotary beam kN
|
4500
|
4500
|
4500
|
4500
|
4500
|
Max. load of setback beam kN
|
2520
|
2200
|
2520
|
2520
|
2200
|
Static hook load, max. kN
|
4500
|
4500
|
4500
|
4500
|
4500
|
Mast bottom span m
|
8.5
|
9
|
9.11
|
9.11
|
9.11
|
Weight kg
|
160000
|
168000
|
134000
|
135400
|
112000
|
|
|
|
|
|
|
Model
|
DZ450/7.5-K
|
DZ315/9-S
|
DZ315/9-G
|
DZ250/7.5-S
|
DZ250/6-XD
|
Drill floor height m
|
7.5
|
9
|
9
|
7.5
|
6
|
Clearance height under rotary beam m
|
6.26
|
7.68
|
7.6
|
6.3
|
5.1
|
Max. load of rotary beam kN
|
4500
|
3150
|
3150
|
2500
|
2500
|
Max. load of setback beam kN
|
2340
|
1810
|
1800
|
1300
|
1300
|
Static hook load, max. kN
|
4500
|
3150
|
3150
|
2500
|
2500
|
Mast bottom span m
|
9
|
8.3
|
9.11
|
7
|
7.5
|
Weight kg
|
104000
|
125000
|
101500
|
92000
|
71000
|
|
|
|
|
|
|
Model
|
DZ225/6.7-SS
|
DZ225/7.5-SS
|
DZ170/5-XD
|
DZ170/5.5-XD
|
DZ135/4.5-X
|
Drill floor height m
|
6.7
|
7.5
|
5
|
5.5
|
4.5
|
Clearance height under rotary beam m
|
5.42
|
6.2
|
4.08
|
4.58
|
3.7
|
Max. load of rotary beam kN
|
2250
|
2250
|
1700
|
1700
|
1350
|
Max. load of setback beam kN
|
1440
|
1440
|
1080
|
1080
|
800
|
Static hook load, max. kN
|
2250
|
2250
|
1700
|
1700
|
1350
|
Mast bottom span m
|
5
|
7
|
7.5
|
7.5
|
5.3
|
Weight kg
|
61000
|
75000
|
69200
|
71000
|
37300
|
|
|
|
|
|
|
Model
|
DZ90/1.7-X
|
DZ60/1.1-X
|
HXDZ135/6.7-6/21
|
HXDZ135/6.7-6/21
|
DZ450/10.5-S
|
Drill floor height m
|
1.7
|
1.1
|
6.7
|
6.7
|
10.5
|
Clearance height under rotary beam m
|
0.81
|
0.53
|
5.5
|
5.5
|
9.2
|
Max. load of rotary beam kN
|
900
|
600
|
1350
|
1350
|
4500
|
Max. load of setback beam kN
|
500
|
300
|
800
|
800
|
2520
|
Static hook load, max. kN
|
900
|
600
|
1350
|
1350
|
4500
|
Mast bottom span m
|
5.5
|
5.3
|
4
|
4
|
10
|
Weight kg
|
27000
|
20000
|
80000
|
80000
|
169800
|
1.One-Stop Procurement Service
1.Are you manufacturer or supplying company?
We are supplying company, not manufacturing factory, but we think we have some advantages over factory. We can manage full coverage and one-stop supply for our clients Manufacturers usually focus only on limited product range, but drilling requires comprehensive system, we can easily combine it based on our complete supply chain and vendor system.
2.How do you choose your vendor?
We insist on Independent & optimized selection of vendors depending on client personalized requirement Factory usually only sell their own products, no matter it good or bad, but we know which factory is good for different products with more than 15 years experience in this field, so we will choose the best factory based on their quality and delivery time.
3.What value you can bring to us?
We can help the clients to save their time cost with professional & efficient communications.Due to time difference, the customer may need to talk to different Chinese suppliers every day, but we can do this communication job easily and summarize final proposal to the customer.
4.What other advantages you are bearing?
1)To reduce the customer increased risk for interma disputes by centralized procurement The customer do not need to verify reliability for numerous different suppliers, just need to verify BEYOND, and we can supply full docs for verification.
2)Quick Response & Action: Flexible Private company, quick decision-making and fast action than those big factories with complicated procedures.
5.How do you work with your vendors?
We are possessing strategic partnership and distributorship certificates from our different vendors. For some of them we are working as their Exclusive Distributor for overseas market
6.How you will manage the after-sale services?
All our after-sale services will be carried out by engineers and technicians from our different vendors. But BEYOND will work as the coordinator between the client and the manufacturing factory and will take full responsibility to the client side.