Customization: | Available |
---|---|
Warranty: | 1 Year |
Certification: | API |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
No. | Name | Model | Technical Specification | Unit | Qty |
Drilling Rig | XJ350 | Sevice depth: 2500m (2-7/8" EUE tubing) Max. hood load: 900KN Rated power: 385HP Mast height: 33m Racking board height: 17m, 21m Traveling system: 4×3 Carrier drive: 10×8 Drilling line dia.:φ26mm Transportation size: 20×3.2×4.5m Max. drive speed: 45km/h Main rig unit working temp: -15ºC----45ºC |
|||
A | Main rig | ||||
1 | Carrier | 10×8 | Carrier drive: 10×8 Climbing degree: 26% Approaching/depart angle: 26°/18 Clearance: 311mm Min. turning radiu: 19.5m |
||
1.1 | Truck frame | c/w frame, mud fender, raising cylinder base and hydraulic jack beam. | set | 1 | |
1.2 | Axle | CQ | joint | 5 | |
1.3 | Wheel tire | 18-22.5/12R20 | single tire/ dual tire | pcs | 18 |
1.4 | Driver's Cabin | cab with single driver | set | 1 | |
1.5 | Hydraulic jack | Y3030B | pcs | 4 | |
1.6 | Steering system | c/w steering pump, cylinder, pipeline etc. | set | 1 | |
1.7 | Suspention system | set | 1 | ||
1.8 | Transmission shaft | CZD | set | 1 | |
1.9 | fuel tank and air chamber | c/w dual fuel tank and air storage | set | 1 | |
2 | Diesel engine | C11 | Power:385HP Speed:2100r/min |
set | 1 |
3 | Transmission case | M4700OFS | Max Power :600HP Max Speed : 2500rpm Max torque: 2508N•m 7-FORWARD-1-REVERSE |
set | 1 |
4 | Transfer case | FD110 | Max. torque: 11kN.m Max input speed: 2100rpm |
set | 1 |
5 | Angle gear box | JCX110 | Max. torque: 11kN.m Max input speed: 2100r/min |
set | 1 |
6 | Drawworks | JC18 | Rated input power: 350HP Input speed: 450r/min astline force: 180KN Brake type: band brake+auxiliary brake crown saver inner circuilating cooling for brake rim |
set | 1 |
7 | Auxiliary brake | Air control disc brake 5026-CM MADE in CANADA | set | 1 | |
8 | Mast | JJ9033 | dual section mast, with front opening, c/w guyline and cylinders for raising and teslescoping Mmax. load:900kN Efficient height:33m Racking board capacity:2500m(2-7/8″EUE tubing) Wind capacity: (no hook load and setback)110km/h c/w racking board, guyline, ladder and safety equipment |
set | 1 |
9 | Mast raising mechanism | Dual-telescopic; dual raising cylinder | set | 1 | |
10 | Travelling system | conform with API standard API Spec 8A Line system: 5*4; Drilling line dia. :φ26mm Max. hood load:900KN |
set | 1 | |
10.1 | Crown block | TC90 | sheave no.:4 Max. load:900kN drill line dia.φ26mm |
set | 1 |
10.2 | Hook block | YG90 | max. load:900kN sheave no. :3 |
set | 1 |
10.3 | Drilling line | φ26 | Length: 380m; as per API Spec 9A | set | 1 |
11 | Hydraulic cathead | Y15160 | Make-up force:100KN connect force Break-out force:150KN break force |
set | 2 |
12 | Sloping chain box | set | 1 | ||
13 | Brake cooling circulation system | set | 1 | ||
14 | Pneumatic system | Rated pressure: 0.85MPa c/w valves and pipeline. (main parts imported) |
set | 1 | |
15 | Hydraulic system | rated pressure:14Mpa c/w valves and pipeline. (main parts imported) |
set | 1 | |
16 | Electrical system | carrier voltage:24V mast voltage:220V crown block c/w red alert lamp, mast, substrucutre and the rig c/w ex-proof lamp. |
set | 1 | |
17 | Climbing assistant device | set | 1 | ||
18 | Anti-falling device | TS-30 | set | 1 | |
19 | Deadline anchor and weight indicator | JZ100 | set | 1 | |
20 | Elevator links | DH100 | set | 1 | |
21 | Hydraulic winch | IYJ3 | set | 1 | |
IYJ5 | set | 1 | |||
22 | Mast base | set | 1 | ||
23 | Rope device | set | 1 | ||
24 | Rig base | set | 1 |