| Customization: | Available |
|---|---|
| After-sales Service: | 1year |
| Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency




| No. | Name | Model | Technical Specification | Unit | Qty |
| Drilling Rig | ZJ40 | (drilling depth): 4000m (4-1/2" DP) (workover depth: 9000m (27/8 " DP)(drilling depth):7500m(31/2" DP) (drilling depth):6000m(41/2" DP) (max. hood load): 2250KN (rated power): 630HP×2 (amst height): 38m (racking board height): 22m, 23m, 24m (traveling system): 6×5 (carrier drive): 14×10 (drill line dia.):φ32mm (outline size): 23×3.2×4.5m (max. drive speed): 45km/h (working temp): -19ºC----40ºC |
|||
| Main rig | |||||
| 1 | Carrier | XD70/14×8 | (carrier drive): 14×10 (climbing degree): 26% /(approaching/depart angle): 26°/18 (clearance): 311mm (min. turning radiu): 19.5m |
||
| 1.1 | Truck frame | c/w frame, mud fender, raising cylinder base and hydraulic jack beam. | set | 1 | |
| 1.2 | Axle | CQ | joint | 7 | |
| 1.3 | Wheel tire | 18-22.5 | single tire | pcs | 7 |
| 12R20 | dual tire | pcs | 17 | ||
| 1.4 | Driver's Cabin | cab with single driver | set | 1 | |
| 1.5 | Hydraulic jack | Y3030B | pcs | 4 | |
| 1.6 | Steering system | c/w steering pump, cylinder, pipeline etc. | set | 1 | |
| 1.7 | Suspention system | set | 1 | ||
| 1.8 | Transmission shaft | CZD | set | 1 | |
| 1.9 | fuel tank and air chamber | c/w dual fuel tank and air storage | set | 1 | |
| 2 | Diesel engine | C18 | (power):630HP × 2 (speed):2100r/min |
set | 2 |
| 3 | Transmission case | 6620OFS-R | set | 2 | |
| 4 | Compound transfer case | BFX260 | (max. torque): 26kN.m (input speed) : 2100rpm |
set | 1 |
| 5 | Angle gear box | JCX240 | (max. torque): 24kN.m (input speed): 2100r/min |
set | 1 |
| 6 | Drawworks | JC28/11 | (input power): 735KW | set | 1 |
| (input speed): 450r/min | |||||
| (fastline force): 280KN | |||||
| (drum dia): φ640mm | |||||
| (bank brake+auxiliary brake) | |||||
| (brake rim size): Φ1270×267mm | |||||
| (crown saver) | |||||
| (sand line force): 110KN | |||||
| (sand drum size): φ340mm | |||||
| (sand line dia): φ9/16" | |||||
| (sand drum rim size): Φ970×210mm | |||||
| inner circuilating cooling for brake rim | |||||
| 7 | Auxiliary brake | WCB236 | set | 1 | |
| 8 | Mast | JJ22538 | dual section mast, with front opening, c/w guyline and cylinders for raising and teslescoping (max. load):2250kN (efficient height):38m (racking board capacity):4000m(4-1/2″) (wind capacity):(, no hook load and setback)110km/h c/w racking board, guyline, ladder and safety equipment | set | 1 |
| 9 | Mast raising mechanism | duan raising and telescoping cylinder | set | 1 | |
| 10 | Substructure | DZ225/6 | foldable substructure floor size:7.2×6(m) (max. load):2250kN working height:6m clearance under rotary beam:4.8m DP capacity (4-1/2")4000m |
set | 1 |
| 11 | Travelling system | API Spec 8A(5×6) conform with API standard. drill line dia. :φ32mm max. hood load:2250KN |
set | 1 | |
| 11.1 | Crown block | TC225 | sheave no.:6 max. load:1800kN drill line dia.φ32mm |
set | 1 |
| 11.2 | Hook block | YG225 | max. load:2250kN sheave no. :5 |
set | 1 |
| 11.3 | Drilling line | φ32 | : 460, API Spec 9A 460 meters long | set | 1 |
| 12 | Swivel | SL225 | swivel load:2250kN rated working pressure :35Mpa washpipe dia. :φ76mm |
set | 1 |
| 13 | Hydraulic cathead | Y15160 | :100KN connect force :150KN break force |
set | 2 |
| 14 | Rotary table gearbox | ZPX60D | set | 1 | |
| 15 | Sloping chain box | set | 1 | ||
| 16 | Rotary table | ZP275 | open hole dia. :698.5mm(27 1/2") max. load: 4450kN |
set | 1 |
| set | |||||
| 17 | Brake cooling circulation system | set | 1 | ||
| 18 | Pneumatic system | rated pressure: 0.85MPa c/w valves and pipeline imported. |
set | 1 | |
| 19 | Hydraulic system | rated pressure:14Mpa . c/w valves and pipeline imported |
set | 1 | |
| 20 | Electrical system | carrier voltage:24V mast voltage:220V crown block c/w red alert lamp, mast, substrucutre and the rig c/w ex-proof lamp. |
set | 1 | |
| 21 | Standpipe | 4″ | joint | 1 | |
| 22 | Hose | 4″ | :35MPa, 17m working pressure 35Mpa, 17 meters long | joint | 1 |
| 23 | Racking platform escaper | set | 1 | ||
| 24 | Climbing assistant device | set | 1 | ||
| 25 | Anti-falling device | set | 1 | ||
| 26 | Deadline anchor and weight indicator& | JZ250 | set | 1 | |
| 27 | Elevator links | DH250 | set | 1 | |
| 28 | Hydraulic winch | YJ3 | set | 1 | |
| YJ5 | set | 1 | |||
| 29 | DP slide\ | set | 1 | ||
| 30 | Drilling pipe V-door and catwalk way | set | 1 | ||
| 31 | Mast base | set | 1 | ||
| 32 | Rig base | set | 1 |