• API Standard 1500HP Skid-Mounted 5000m Zj50j Oil Drilling Rig
  • API Standard 1500HP Skid-Mounted 5000m Zj50j Oil Drilling Rig
  • API Standard 1500HP Skid-Mounted 5000m Zj50j Oil Drilling Rig
  • API Standard 1500HP Skid-Mounted 5000m Zj50j Oil Drilling Rig
  • API Standard 1500HP Skid-Mounted 5000m Zj50j Oil Drilling Rig
  • API Standard 1500HP Skid-Mounted 5000m Zj50j Oil Drilling Rig

API Standard 1500HP Skid-Mounted 5000m Zj50j Oil Drilling Rig

After-sales Service: 1 Year
Warranty: 1 Year
Certification: CE, RoHS, ISO 9001:2000, ISO 9001:2008
Condition: New
Motor: Optional
Drill Hole Diameter: >300mm
Customization:
Diamond Member Since 2021

Suppliers with verified business licenses

Trading Company
  • Overview
  • Product Description
  • Product Parameters
  • Certifications
  • Company Profile
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
ZJ50J
Drill Hole Depth
>300m
Bit Type
Cone Bit
Drilling Way
Rotary
Drilling Depth
5000 Meters
Max. Loading Capacity
3150kn
Max. Drilling String Load
160t
Max. Drawworkds Input Power
1500HP
Main Brake
Hydraulic Disc Brake
Auxiliary Brake
Fdws50 Air Cooler Electromagnetic Eddy Current Bra
Wire Line Dia.
35mm
Diesel Engine Power
1300HP
Diesel Engine Qty
2
Mast Type
K
Mast Height
45m
Specification
18.5*2.9*4.2m
Trademark
Beyond
Origin
China
HS Code
8431431000
Production Capacity
10pecies/Year

Product Description

Product Description

The ZJ50/3150J drilling rig is a mechanical unified drive drilling rig that adopts a belt parallel transmission scheme.
The power of the three diesel engines is decelerated by the 1000Hp reduction box and then input to the linkage units I, II, and III respectively. It is divided through the narrow V-belt drive and parallel train power combination and then drives the JC50 winch through the main carriage and the chain; from the linkage units II and III The power is taken out and decelerated through the narrow V-belt belt drive to drive two mud pumps; the power is taken out from the fast shaft of the No. 1 linkage unit and the belt drives an energy-saving generator and an automatic blower. Three G12V190PZL-1 diesel engines and three linkage units are installed on a 1.25m high base in the background.
There is a turntable drive device arranged under the drill floor, which takes out the power from the high-speed end of the drawworks, inputs the power to the turntable drive box through the angle transmission box and the cardan shaft climbing device, and drives the ZP375 turntable through the cardan shaft.
The drawworks is installed at a low position, the main brake adopts hydraulic disc brake, the auxiliary brake adopts air-cooled electromagnetic eddy current brake, and the friction clutch shifts gears to realize remote centralized control by the driller.
The front desk of the drilling rig base is a box-stack structure. The height of the front desk is 7.5m, and the height of the backstage base is 1.25m. There is a water tank in the inner cavity of the drawworks base.
The K-type mast is installed at a low position and lifted as a whole.
The drilling rig is powered by three G12V190PZL-1, 1500rpm, 1000kW diesel units; one 500kW energy-saving generator set and a 500kW+150kW auxiliary generator set.
The drilling rig adopts a modular design, which is easy and fast to install and easy to transport.

API Standard 1500HP Skid-Mounted 5000m Zj50j Oil Drilling Rig

API Standard 1500HP Skid-Mounted 5000m Zj50j Oil Drilling Rig
 

Product Parameters
Model ZJ50J
Drilling depth 5000m
Max. loading capacity 3150kN
Drawworks max. input power 1500hp
Main brake Hydraulic disc brake
Auxiliary brake FDWS50 air-cooled electromagnetic eddy current brake
Diesel engiine power & number 1300hp; 2pcs
Mast type & height K type; 45m
Hight pressure manifold 4'' x 35MPa
Mud tank capacity 200 m³
 

 

Well site layout
The drilling rig site layout is divided into five areas: drill floor area, engine room power area, mud pump area, solid control area and oil and water tank area.
Drill floor area: including mast, base, drawworks, turntable drive device, lifting system, wellhead mechanized tools, driller's side room and driller's control room, etc.
Power area of the machine room: including 3 G12V190PZL-1 diesel engines, a belt paralleling device composed of 3 linkage units, energy-saving generators, automatic air compressors, etc.
Mud pump area: arrange two 1300Hp mud pumps, drilling fluid manifolds, etc.
Mud circulation and water tank solid control area: including mud circulation tanks, mud purification equipment, etc.
Oil and water tank farm and ancillary equipment: including MCC room, gas source room, diesel generator set, oil tank, water tank and pipelines.
Barracks area: living area barracks, fire room, tool room, kitchen, dining room, restroom, etc.
 
Certifications

 

API Standard 1500HP Skid-Mounted 5000m Zj50j Oil Drilling Rig
Company Profile

Shandong Beyond Petroleum Equipment Co., Ltd, was established in year 2016 and certified by ISO9001. Its main business scope is to supply drilling equipment and spares for overseas customers from different sectors, like petroleum, water well, construction and HDD.

 
Beyond products cover but not limited to: oil drilling & workover rig, water well drilling rig, pile drilling rig, horizontal directional drilling rig, mud pump and spares, solid control system & equipment, and other different drilling materials.
Dedicated to strict quality control and thoughtful customer service, our experienced staff members are always available to discuss your requirements and ensure full customer satisfaction. We can customize the product supply as per your on-site conditions, and we can offer overseas after-sale services with our strong technical support.
API Standard 1500HP Skid-Mounted 5000m Zj50j Oil Drilling RigAPI Standard 1500HP Skid-Mounted 5000m Zj50j Oil Drilling RigAPI Standard 1500HP Skid-Mounted 5000m Zj50j Oil Drilling Rig
Packaging & Shipping

API Standard 1500HP Skid-Mounted 5000m Zj50j Oil Drilling Rig

FAQ

1. who are we?
We are based in Shandong, China, start from 2016,sell to Eastern Europe(30.00%),North America(10.00%),South
America(10.00%),Southeast Asia(10.00%),Africa(10.00%),Mid East(10.00%),Oceania(5.00%),Central America(5.00%),South
Asia(5.00%),Domestic Market(5.00%). There are total about 11-50 people in our office.

2. how can we guarantee quality?
Always a pre-production sample before mass production;
Always final Inspection before shipment;

3.what can you buy from us?
MUD PUMP,DRILLING PUMP,PISTON PUMP,PLUNGER PUMP,CEMENTING PUMP

4. why should you buy from us not from other suppliers?
1.Professional & Efficient, Customer Focus, Win-win Cooperation 2.Competitive price & within shortest lead time 3. Overseas
technical after-sale services 4. OEM services

5. what services can we provide?
Accepted Delivery Terms: FOB,CFR,CIF,EXW,FAS,CIP,FCA,CPT,DEQ,DDP,DDU,Express Delivery,DAF,DES;
Accepted Payment Currency:USD,EUR,JPY,CAD,AUD,HKD,GBP,CNY,CHF;
Accepted Payment Type: T/T,L/C,D/P D/A,MoneyGram,Credit Card,PayPal,Western Union,Cash,Escrow;
Language Spoken:English,Chinese,Spanish,Russian

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now