Customization: | Available |
---|---|
Certification: | ISO 9001:2000, ISO 9001:2008 |
Condition: | New |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Description
|
XJ250 Workover Rig (Overhaul)
|
XJ250 Workover Rig (Servicing)
|
Workover Depth
|
3,200m(10,500ft, 2-7/8'' DP)
|
2,000m(6,560ft, 2-7/8'' DP)
|
Servicing Depth
|
3200m (10,500ft, 2-7/8''EUE Tubing)
|
|
Rated Hook Load
|
400kN (90,000 lbf)
|
|
Max. Hook Load
|
735kN (165,000 lbf )
|
675kN (151,700 lbf)
|
Traveling System
|
3×4 {Φ22mm (7/8'') Wireline)
|
|
Hook Hoisting Speed
|
1.5m/s (4.92ft/s)
|
|
Overall Dimensions(l×w×h)
|
18.5×2.9×4.2m60.7×9.5×13.8ft
|
16.5×2.9×4.2m54.1×9.5×13.8ft
|
Weight
|
50,000kg (110,230 lb)
|
45,000kg (99,200lb)
|
Max. Travel Speed
|
60km/h (37mph), but limit 45km/h(28mph)
|
|
Carrier
|
Self-propeller 10×8
|
Self-propeller 6×4
|
Engine Model and Rated Power
|
Cat C9/ATAAC260kW(350hp/2100rpm)
|
|
Transmission
|
Allison 4700 OFS
|
|
Derrik Height
|
31m (102ft)
|
27m (89ft)
|
Max. Static Hook Load
|
735kN (165,000 lbf)
|
675kN (151,700 lbf)
|
Racking Board Capacity
|
3200m (10,500 ft, 2-7/8'' EUE TB)
|
|
Racking Board Height
|
20.1m (66 ft)
|
16.8m (55ft)
|
Drawwork Rated Power
|
185kW (250hp, Double drum)
|
|
Main Drum
|
Φ336×828mm (Φ13.2'' ×32.6'')
|
|
Max. Faster Line Pull
|
145kN (32,600 lbf)
|
|
Sanding Drum
|
Φ315 mm×908mm (Φ12.4'' ×35.7'')
|
|
Air Assist Brake System
|
KOBELT Disc 4-7-35'' Caliper 5026-CM
|
|
Drill Floor (l×w×h)
|
4.2×4.2×3.3m (13.8×13.8×10.8 ft)
|
|
Swivel Model and Max. Load
|
SL90 900kN (202,330 lbf)
|
|
ZP125 Rotary Table
|
Max. Load 900kN (202,330 lbf) Max. Open Dia. 292mm (11.5'')
|
BEYOND is established on request of customer and aimed to supply best product and service for the customer. It focuses on to supply best solutions for the overseas oilfield customer on equipment & spares maintenance and supply.
China has become main equipment supplier for oil production countries, but Chinese equipment has some special features different with European and American countries, also there exits big language and cultural difference between China and other countries, so it has become one big challenge for the overseas customer to get the exact equipment and parts they need in a short time.
However, BEYOND takes root in China, and has very good cooperation relationship with most of famous factories, plus strong technical support and good advantage in language. Therefore, BEYOND is quite capable to help the customer to solve this challenge.
Q: How long is your delivery time?
A: Generally for the pump spares we have in stock, and for mud pump and other drilling rig equipment, the delivery is in 30 working days, for 1 complete set of drilling rig, the delivery time will be at least 60 working days.